OUR PLANTS

Kangal Hybrid Power Plant
Project Name: Kangal Hybrid Power Plant
Main Source: Wind/Solar
Installed Power: 205 MWm
MWmLocation: Kangal / Sivas
Date of Operation: 2014

Project Name: Bereketli Wind Power Plant
Main Source: Wind
Installed Power: 41 MWm
Location: Tokat
Date of Operation: 2016

Project Name: Kiyikoy Wind Power Plant
Main Source: Wind
Installed Power: 45 MWm
Location: Tekirdag
Date of Operation: 2015

Project Name: Akyurt Wind Power Plant
Main Source: Wind
Installed Power: 23.7 MWm
Location: Tokat
Date of Operation: 2016

Project Name: Karaçayır Wind Power Plant
Main Source: Wind
Installed Power: 21.6 MWm
Location: Sivas
Date of Operation: 2016

Project Name: Konakpınar Wind Power Plant
Main Source: Wind
Installed Power: 23.7 MWm
Location: Sivas
Date of Operation: 2016

Arca Regulator and Hydroelectric Power Plant
Project Name: Arca Hepp
Main Source: Water
Installed Power: 17.58 MWm
Location: Trabzon
Date of Operation: 2012
